top of page

Addition & Renovation - Ottsville PA

Almost ready for roofing.

Beautiful framing.

Framing the interior of the addition.

Taking apart the interior of the upstairs of current home to get ready for everything to be new!

First floor deck is complete.

Finishing up the foundation membrane system.

Engineered floor system

Concrete crawl space floor.

Walls are insulated

Waterproof membrane system installed

Dustin from Souder Masonry setting block for a strong foundation.

Form work for level footings.

Perfect forms for perfect footings.

Temporary construction driveway so we can bring the big equipment in.

Before renovation

bottom of page